Compare Connections, City Requirements and Total Scope
Normalize every proposal against the same property evidence, then keep City decisions and unresolved connection assumptions separate from contractor pricing.
- V-01
Give every bidder one evidence package
Provide the symptom timeline, existing-system dossier, route sketch, inspection footage, access measurements, tree and hardscape notes, known outlet records and relevant City correspondence. Use a common list of questions and require bidders to state which evidence supports the proposed boundary. If one contractor includes investigation that another assumes is complete, separate that cost before comparing totals. A consistent package reduces the risk that quotes reflect different facts, different foundation sides or different definitions of perimeter drain replacement.
Issue one dated property file
Require evidence-linked boundaries
Separate investigation from construction
- V-02
Record the proposed connection and authority route
Create a row for the proposed outlet, the document or observation supporting it, and the person responsible for confirming requirements. Victoria states that installing or altering a stormwater utility connection requires a plumbing permit and directs connection questions to Engineering, while site-drainage work can involve different circumstances. Do not turn that general page into a property-specific permit decision. Record the address, described work, dated City response, application or inspection owner, fees or deposits if confirmed, and any unresolved prerequisite.
Name the proposed outlet
Assign City confirmation
Retain dated responses and conditions
- V-03
Normalize access and excavation quantities
Compare included foundation sides or lengths, assumed depths, access method, utility locating, tree measures, spoil handling, temporary water control and protection of neighbouring surfaces. Ask for quantities, unit rates or clearly defined allowances where practical. Keep excavation safety with the responsible contractor and qualified reviewers. A lump sum with no mapped boundary cannot be fairly compared with a proposal that identifies each side, obstacle and restoration area. Mark conditions that could change the excavation method or price after exposure.
Map the excavation boundary
Compare quantities and allowances
Identify hidden-condition triggers
- V-04
Compare wall and drainage components
Place wall preparation, crack or penetration review, membrane or drainage layer, protection, pipe, fittings, cleanouts, sumps, pumps, aggregate, separation material and transitions in one table. Confirm that every item is actually included and supported by current product information where applicable. Keep structural work and professional design separate unless expressly reviewed and priced. Compare installation details and pre-cover hold points, not only product names. State who produces the photographs, measurements, inspection records and final route diagram.
List components line by line
Separate structural and drainage scope
Require pre-cover evidence
- V-05
Expose restoration and exclusions
Compare soil, lawn, plantings, protected trees, irrigation, fences, decks, stairs, concrete, asphalt and pavers by area and finish. Identify what is restored, allowed for, excluded or assigned to another trade. Review settlement, plant survival and material-matching limitations. List other exclusions such as electrical supply, pump backup, hazardous material, structural repair or neighbour access only when relevant to the offered work. A lower drainage price can create a higher total property cost when access and surface restoration sit outside the contract.
Price restoration by surface
Separate allowances and exclusions
Compare total property cost
- V-06
Define changes, schedule and closeout
Require written authorization before added work, with photographs or measurements showing the condition that triggered it. Compare mobilization assumptions, weather contingencies, daily protection, inspection timing, payment milestones and responsibility for delays tied to approvals or hidden conditions. Then list closeout deliverables: permits or inspections, product documents, testing, route and component photographs, final drawings, maintenance information and remaining exclusions. Avoid unsupported warranties or dry-basement guarantees; compare only written terms that can be verified in the actual proposal.
Require written changes
Tie payments to evidence milestones
List closeout deliverables
- V-07
Choose the complete responsibility schedule
Score proposals for evidence, defined boundaries, access planning, wall and drain components, outlet confirmation, City responsibility, testing, restoration, schedule, closeout and change control. Verify qualifications, insurance and contract terms through appropriate records rather than website claims. Resolve material differences in writing before selection. The wet-basement, older-system, inspection, tight-access and replacement pages supply the supporting checklists. Retain the comparison and all clarifications with the accepted agreement so changes can be measured against the scope that was actually approved.
Resolve differences before award
Compare total responsibility, not one number
Keep the matrix with closeout records